plop SPACEPHOTOS
 Untitled Document




   Home » Ref S13114 (detail)

 
My Light Box / Estimate Request : 0 image(s)
Alternate choice of images for this theme
                        
Save this image free of charge
in 800 pixels for layout use
(right click, Save as...)



Ref : S13114

Theme : Testings - Satellites - Probes - Rockets  (2314 images)

Title : Inside the Operations and Checkout Building high bay

Caption :

(02/25/1999) -- Inside the Operations and Checkout Building high bay, Center Director Roy Bridges remarks on the accomplishment of the joint NASA/Boeing team in renovating an altitude chamber formerly used on the Apollo program. Project team members, management, media and onlookers are present for the ribbon cutting. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test